Roads

Græsted-Gilleleje
In Gribskov Municipality, from Græsted to Gilleleje, a 3 km long and 8 meter wide country road is being constructed with a four-legged roundabout at Græstedvej and a two-way bicycle path along the entire route. The new road, which connects to the existing roundabout at Græsted, aims to improve both accessibility and traffic safety in the area.
The project includes local rainwater management along the entire road with both ditches and 3 LAR ponds.
Client Gribskov Municipality
Turnkey contractor and photo Arkil
Services Design management, geotechnical preliminary investigations, and detailed design for the entire facility, including project follow-up and specialist supervision.

From Roundabout to Signalized Intersection
On Brogårdsvej in Gentofte, heavy traffic during rush hours has caused traffic safety issues in a large roundabout, especially for cyclists. To enhance safety, security, and accessibility for everyone, Artelia has been tasked with converting the Brogårdsvej/Søbredden roundabout into a signalized T-intersection. Artelia conducted preliminary traffic and accident analyses of the roundabout, and in close collaboration with RAW Mobility, we designed a signalized intersection with bicycle detection and prioritization, where left-turning bicycle traffic towards Søbredden is handled in its own phase, avoiding conflicts with other traffic.
Client Gentofte municipality
Services Road design and traffic safety

Safe School Route for Ålholm School Students
A large number of students at Ålholm School in Valby must cross Valby Langgade daily, a busy road that feels unsafe for many school children. In this context, efforts have been made to increase students’ traffic safety and security by improving the crossing of Valby Langgade with several measures and making significant changes a 5-legged signalized intersection.